EVPP0080 16A 5m Type 2 - Type 2 Charging

WHAT'S INCLUDED IN A BASIC INSTALLATION 

The nitty gritty ...

This guide explains what a 'basic installation' includes, as well as things that come in as ‘extra costs’. 

Our 'basic installation' package includes the following: 

  • The fitting of your selected Chargepoint on a brick or plaster wall, or other suitable permanent structure. 

  • Routing of the cable through a drilled hole in a wall up to 500mm (20 inches) thick, where needed 

  • Up to 10 metres of cable, run and neatly clipped to the wall between the distribution board and the Chargepoint up to a height of up to 1.8m. 

  • All electrical connections at the origin of the supply and Chargepoint. 

  • Installation of a Type C MCB. 

  • Electrical testing and the NICEIC Certification. 

  • Demonstration of the Chargepoint functions and App (if applicable) 

  

What can increase the cost of your EV charge point installation? 

There are a number of factors, but here are a few examples that can increase the cost of your installation: 

  • Earth rod - some charge points and properties require an earth to be installed. 

  • EV Consumer Unit - some charge points and properties require this to be installed where an earth rod isn't possible. 

  • Extra cabling - if more cabling over the 10 metres already included is needed then this will cost extra. 

  • Type A RCBO - this is a protective device required for some installations to protect against current overload, AC and DC leakage. 

  • Dedicated two-way distribution board - this may be required if your present fuse-box does not have any suitable spare "ways". 

  • Extra labour - for more complex installations or for jobs that will simply take longer (above the normal hours included). 

077020 67742 or 01453 549291

©2020 by Lawgrove Electrical. Proudly created with Wix.com