WHAT'S INCLUDED IN A BASIC INSTALLATION
The nitty gritty ...
This guide explains what a 'basic installation' includes, as well as things that come in as ‘extra costs’.
Our 'basic installation' package includes the following:
-
The fitting of your selected Chargepoint on a brick or plaster wall, or other suitable permanent structure.
-
Routing of the cable through a drilled hole in a wall up to 500mm (20 inches) thick, where needed
-
Up to 10 metres of cable, run and neatly clipped to the wall between the distribution board and the Chargepoint up to a height of up to 1.8m.
-
All electrical connections at the origin of the supply and Chargepoint.
-
Installation of a Type C MCB.
-
Electrical testing and the NICEIC Certification.
-
Demonstration of the Chargepoint functions and App (if applicable)
What can increase the cost of your EV charge point installation?
There are a number of factors, but here are a few examples that can increase the cost of your installation:
-
Earth rod - some charge points and properties require an earth to be installed.
-
EV Consumer Unit - some charge points and properties require this to be installed where an earth rod isn't possible.
-
Extra cabling - if more cabling over the 10 metres already included is needed then this will cost extra.
-
Type A RCBO - this is a protective device required for some installations to protect against current overload, AC and DC leakage.
-
Dedicated two-way distribution board - this may be required if your present fuse-box does not have any suitable spare "ways".
-
Extra labour - for more complex installations or for jobs that will simply take longer (above the normal hours included).